Container Houses

CONTAİNER HOUSE PROCESS

  • Step 1: Initial Consultation
  1. Contact Framod: The client reaches out to Framod via phone, email, or the company’s website to express interest in a container house.
  2. Schedule a Consultation: Framod schedules an initial consultation to discuss the client’s vision, requirements, budget, and timeline.

Step 2: Design and Customization

  1. Design Brief: The client provides a detailed design brief, including desired layout, number of rooms, preferred materials, and specific customizations.
  2. Initial Design Proposal: Framod’s design team creates an initial design proposal based on the client’s specifications.
  3. Review and Feedback: The client reviews the initial design and provides feedback. Framod makes any necessary adjustments to the design.
  4. Final Design Approval: Once the design meets the client’s expectations, the client approves the final design.

Step 3: Quotation and Agreement

  1. Detailed Quotation: Framod provides a detailed quotation, including costs for design, materials, construction, shipping, and any additional services.
  2. Agreement Signing: The client reviews and signs a formal agreement, which outlines the scope of work, payment terms, and project timeline.

Step 4: Permits and Approvals

  1. Regulatory Compliance: Framod assists the client in obtaining any necessary permits and approvals required by local authorities.
  2. Site Preparation: The client prepares the site according to the specifications provided by Framod, ensuring it is ready for the delivery and installation of the container house.

Step 5: Construction and Fabrication

  1. Material Procurement: Framod sources high-quality materials and containers for the project.
  2. Container Modification: Framod’s skilled team begins modifying the containers according to the approved design, including cutting, welding, and reinforcing structures.
  3. Interior and Exterior Finishing: The containers are fitted with insulation, electrical wiring, plumbing, windows, doors, and interior finishes. Exterior finishes are also applied as per the design.

Step 6: Quality Assurance

  1. Inspection and Testing: Framod conducts thorough inspections and tests to ensure that all construction meets high-quality standards and regulatory requirements.
  2. Client Walkthrough: The client is invited to inspect the completed container house at Framod’s facility or through virtual walkthroughs.

Step 7: Shipping and Delivery

  1. Shipping Arrangements: Framod coordinates the logistics for shipping the container house to the client’s location.
  2. Transportation: The container house is securely transported to the client’s site, ensuring all safety measures are in place during transit.

Step 8: Installation and Assembly

  1. On-Site Assembly: Upon arrival, Framod’s installation team assembles the container house on the prepared site, connecting all modules and systems.
  2. Final Adjustments: Any final adjustments or customizations are made to ensure the house is fully functional and meets the client’s expectations.

Step 9: Handover and Support

  1. Final Inspection: A final inspection is conducted to verify that everything is in order.
  2. Handover: Framod hands over the keys and relevant documentation to the client.
  3. After-Sales Support: Framod provides ongoing support and maintenance services as needed, ensuring the client is satisfied with their new container house.